Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
Construction of Sawa Pearl Residential Complex | Residential buildings and houses, road network, electrical distribution system, and drainage systems | Civil/Architecture | Samawa | 15,788,000.00 | Sawa Pearl Co. | 2022 | 2023 | ||||||||||||||
Well Pad C and E Expansion Badra Oilfield | Earthworks, sub-base works, roadworks, concrete foundations, steel structures | Civil | Kut | 7,500,000.00 | Asawer Oil & Gas Co. Ltd. | 2023 | 2023 | ||||||||||||||
EPC of Well Pad (F) Civil Works and Access Road for Badra Oilfield | Well pad civil works, blinding, paving, prefabricated building installation, access road construction | Civil/Electrical | Kut | 5,200,000.00 | Asawer Oil & Gas Co. Ltd. | 2023 | 2023 | ||||||||||||||
Qalat Salih Road Rehabilitation | Construction of 30km of road shoulders along with signage | Civil | Maysan | 1,977,000.00 | Maysan Governorate | 2022 | 2022 | ||||||||||||||
Construction of a two storey 12-Classroom School | Masonry works, plumbing, electrical, finishing. Including earthworks, sub-base works, R.C foundations, walkways | Civil/Architecture | Maysan | 1,519,000.00 | Maysan Governorate | 2022 | 2023 | ||||||||||||||
Construction of a two storey 12-Classroom School | Masonry works, plumbing, electrical, finishing. Including earthworks, sub-base works, R.C foundations, walkways | Civil/Architecture | Maysan | 1,413,000.00 | Maysan Governorate | 2022 | 2023 | ||||||||||||||
Construction of a two storey 12-Classroom School | Masonry works, plumbing, electrical, finishing. Including earthworks, sub-base works, R.C foundations, walkways | Civil/Architecture | Maysan | 1,413,000.00 | Maysan Governorate | 2022 | 2023 |
Electrical Projects
Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
Supply of MV Cables to Ministry of Electricity | Sypply of MV Cables as follows: 1X70 CU/XLPE/AWA/FRPVC 30KV IEC 60502-2 at 760 meters 1X70 CU/XLPE/AWA/FRPVC 15KV IEC 60502-2 at 1200 meters 3X95 CU/XLPE/SWA/FRLSPVC 10KV IEC 60502-2 at 850 meters 3X150 CU/XLPE/SWA/FRLSPVC 10KV IEC 60502-2 at 1020 meters 3X120 AL/XLPE/SWA/FRLSPVC 15KV IEC 60502-1 at 10km |
Electrical | Wasit | 235,000.00 | General Company of Electrical Energy Transmission/ Middle Region | 2023 | 2023 | ||||||||||||||
Design, supply, installation and commissioning of Numaniyah – ESS102 132kV OHTL | 1- Detailed engineering for foundations, structural design, line design. 2- Procurement of line components, towers, ACSR conductors & fittings, insulators, dampers, spacers, OPGW 3- Construction of RoW, foundations, towers erections, stringing 4- Pre-commissioning, comissioning and handover |
Electrical | Wasit | 7,853,000.00 | General Company of Electrical Energy Transmission/ Middle Region | 2023 | On-going | ||||||||||||||
Supply of 11kV Bus Duct | Supply of 11kV customized busduct equipment along with all auxiliaries and ancillaries | Electrical | Thi-qar | 125,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of 11kV Autorecloser | Supply of 11kV Vaccum Recloser along with 15.5kV voltage transformer | Electrical | Thi-qar | 537,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of HVAC PLC Control Panel | Fabrication and supply of HVAC PLC Control Panel used in 33/11kV Electrical Substation, and supply of Inertial Sand Filter and HVAC Exhaust Fans | Electrical | Thi-qar | 889,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of Earthing & Lightening Protection System | 120mm2 bare tinned copper conductors, 25mm2 and 16mm2 earthing conductors, main earth bars, clamps, weldmetal powder, earthing clamps, earthing rods, compression lugs, cable ties, earthing manholes, and lightening protection system | Electrical | Thi-qar | 510,000.00 | Grand Energy Development Ltd. | 2023 | 2024 |
Mechanical Projects
Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
Construction of Flow-line | Site Survey & Preparation: Conduct site survey, clear area, and prepare trench. Trenching & Excavation: Excavate trenches to required depth and ensure proper alignment. Pipe Laying & Welding: Lay 12-inch pipes, align, and weld joints. Coating & Insulation: Apply anti-corrosion coatings and insulation. Pressure Testing: Perform pressure tests to verify line integrity. Backfilling & Restoration: Backfill trenches and restore site, including site restoration. Commissioning: Conduct final inspections and commissioning of the flow line. |
Mechanical | Basra | 5,650.00 | Calethon Group | 2023 | On-going | ||||||||||||||
Gharraf Oilfield Water Pipeline Installation | Water pipeline installation, valve and fitting work, pressure testing | Mechanical | Thi-qar | 1,750,000.00 | Petronas Carigali Iraq Holding B.V. | 2023 | 2024 | ||||||||||||||
Supply and Delivery of Couplings and Flange Adaptors | Supply and Delivery of Couplings and Flange Adaptors, Pressure Relief Valve, Ball Valves and Reducers | Mechanical | Basra | 539,000.00 | Grand Energy Development Ltd. | 2023 | 2024 |
Cleaning Services
Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
A Vandalized Pipeline nearby Tigris River Spill Response and Cleanup | Industrial cleaning, oil spill containment and cleanup | Cleaning | Kirkuk | 170,000.00 | Kirkuk Government | 2024 | 2024 |
Catering Services
Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
Catering for Maysaloun Temporary Construction Camp | Full catering services for workers, including three daily meals and snacks | Catering | Thi-qar | 250,000.00 approx. / year | Petronas Carigali Iraq Holding B.V. | 2023 | On-going |
General Supply
Project Title | Scope of Work | Discipline | Location | Value (USD) | Client | Year | |||||||||||||||
Supply of MV Cables to Ministry of Electricity | Sypply of MV Cables as follows: 1X70 CU/XLPE/AWA/FRPVC 30KV IEC 60502-2 at 760 meters 1X70 CU/XLPE/AWA/FRPVC 15KV IEC 60502-2 at 1200 meters 3X95 CU/XLPE/SWA/FRLSPVC 10KV IEC 60502-2 at 850 meters 3X150 CU/XLPE/SWA/FRLSPVC 10KV IEC 60502-2 at 1020 meters 3X120 AL/XLPE/SWA/FRLSPVC 15KV IEC 60502-1 at 10km |
Electrical | Wasit | 235,000.00 | General Company of Electrical Energy Transmission/ Middle Region | 2023 | 2023 | ||||||||||||||
Supply of 11kV Bus Duct | Supply of 11kV customized busduct equipment along with all auxiliaries and ancillaries | Electrical | Thi-qar | 125,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of 11kV Autorecloser | Supply of 11kV Vaccum Recloser along with 15.5kV voltage transformer | Electrical | Thi-qar | 537,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply and Delivery of Couplings and Flange Adaptors | Supply and Delivery of Couplings and Flange Adaptors, Pressure Relief Valve, Ball Valves and Reducers | Mechanical | Basra | 539,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of HVAC PLC Control Panel | Fabrication and supply of HVAC PLC Control Panel used in 33/11kV Electrical Substation, and supply of Inertial Sand Filter and HVAC Exhaust Fans | Electrical | Thi-qar | 889,000.00 | Grand Energy Development Ltd. | 2023 | 2024 | ||||||||||||||
Supply of Earthing & Lightening Protection System | 120mm2 bare tinned copper conductors, 25mm2 and 16mm2 earthing conductors, main earth bars, clamps, weldmetal powder, earthing clamps, earthing rods, compression lugs, cable ties, earthing manholes, and lightening protection system | Electrical | Thi-qar | 510,000.00 | Grand Energy Development Ltd. | 2023 | 2024 |